Duong River surface water treatment plant phase 1A

Client: Aquaone
Location: Trung Mau Hamlet, Phu Dong Ward, Gia Lam district, Hanoi city
Production capacity: 150,000m3/day night (Total capacity for 1A & 1B phases is 300,00m3)
Main Contractor: Wabag Vatech (India)
Subcontractor for EICA packages: Novas
Scope of work:
- Installation of all EICA systems for the whole plant
- Commissioning, documentation and training
Eletrical equipment: ABB

SCADA: Vịjeo Citect
Project time: March- October 2018

 

Total access: 144.680

Address: 120 Xo Viet Nghe Tinh, Danang | Phone number: +84 236 3736909 | Fax: | Email: [email protected]
© 2024 by NOVAS